Landscaping

New patio replacing old Asphalt


The 2 man crew did this in 5 days, ripping out the asphalt, utting broken concrete, patching repairs and laying in new block. We're thrilled.

by Accomplished_Pen980

3 Comments

  1. Accomplished_Pen980

    16.00 a square foot for everything, next up we’ll paint the sun porch a light gray just to spruce up the look, replace the garage man door and do a ship-lap feature on the side of the garage to give it a nicer back drop than just white asbestos tiles.

  2. Massive-Attempt-1911

    That’s a great deal. What’s the base? 4-6 inches of RCA topped by 1 inch sand? Where does drainage go?

Write A Comment

Pin