There's still plastic underneath the makeshift stones. That's not good for the environment. It would be better if you actually took the plastic off instead of burning it
That definitely cost more than 30 I mean it's about 2 for a roll of wrap so let's say he got 3 for safety so that's already 6 so that leaves 24 for the bags of cement it's probably about 20 per bag but he'd need 2 bags
25 Comments
Is this legit?? Does quikcrete hold like that?
How much would a job like this actually cost? From a pro?
Some areas it's illegal to burn plastic
Looks shit
30 dollars my hole
There's still plastic underneath the makeshift stones. That's not good for the environment. It would be better if you actually took the plastic off instead of burning it
It's a good idea if you want your walkway to look like complete trash
Even on camera looks horrible no level bed ,no tampering,etc. π few months they wobble every direction
Must be A.I π
Twist your ankle central right there
That definitely cost more than 30 I mean it's about 2 for a roll of wrap so let's say he got 3 for safety so that's already 6 so that leaves 24 for the bags of cement it's probably about 20 per bag but he'd need 2 bags
So the plastic that did not burn off from between them and underneath them still lets water drain through?
Looks like shit
Will double ur work load
Toxic smoke AND micro plastic? That's an all American win-win y'all!
Imagine walking on heels there
Hi is this a great idea to do for a spot in the backyard where my dog can use the RR???
Itβs not 30 Dollar, and beside of that, it is just stupid in about 1000 ways.
Black tar heroin
Coke path
Absolutely useless. And …burning plastic off? No.
Imagine if you fall on it…
definitely not cheaper than pouring concrete
Thats black tar H
Why not just use real stones π