
I recently purchased this with the M4 pump and I'm getting ready to set it up. The optimal placement for my resevoir is under my NFT rack with the 3 55 gallon nutrient resevoirs a few feet away.
My plan is to mount the controller and pumps just above the 55 gallon drums then have the pump doser lines run through a pipe that goes underground and over to the resevoir (about 8-9ft total including mounting height).
The lines are plenty long enough for that but the probes only have 6' cables.
Has anyone successfully used extension cables(BNC?) to bridge the gap?
by Imaginary_Sign3850
Comments are closed.