Before and after, no contractor for anything, all done myself, I work in IT

by FULLPOIL

4 Comments

  1. Ok-Junket-276

    So you unplugged the yard and then plugged it back in again. Good work!

  2. DarthMolar

    What’s the leveling mix? I need to level an area that large. I see mulch. I was planning on mixing sand/topsoil 50/50.

    What did you do? Your result looks amazing.

    Is it one mix? Is it layers? Is it a soil mix with mulch on top?

    Did you pack it with a machine after seeding?

    (Sorry bro – u did good. Gotta get details – that’s why we are all here!)

    Thanks!!!!

  3. Dirtyrib

    Looks Amazing. Being in IT, you could have easily afforded a contractor 😉

Write A Comment

Pin