Chapters:
00:00 Introduction
00:51 Flying over the rose garden
03:03 Side-by-side this episode vs last
New website for the Aquatic Centre
https://www.wavesfitnessandaquatic.com.au
Full disclosure: I have no relationship with The Hills Shire Council other than as a ratepayer. I record construction progress as a public service and for my own pleasure. This video is monetised. Google may pay me a pittance for advertisements shown to viewers.
Use this link to see all the episodes I’ve produced so far:
Use this link to download ultrahigh-resolution maps of the construction site over various dates:
https://bit.ly/2KdsU0x
You’ll also find the original concept plans.
Waves Aquatic Centre Google Maps location
https://goo.gl/maps/eoAr7h3znzwFQEmF8
The Hills Shire Council’s Waves Aquatic Centre Upgrade Masterplan (including future enhancements)