It was time to get the New pathway foundations in place, as we’re going to be doing a chequerboard black and white pathway design!
This is the prep work to make sure the design can be fulfilled successfully in this garden project!
Stay tuned for the final result which is coming VERY SOON👀
#landscaping #pathway #path #garden #gardendesign
Here we go then. What’s going on here? Well, I’ll tell you what’s going on. We’re doing the old foundations for the pathway, aren’t we? Come on. And it’s all in the prep like I’ve said before. Making sure it’s square, level, and just generally. So, we already dug it out. We already membraned it, whacked a bit of type one down there, and then it was ready for the shuttering. Throw a bit of 6 for two in there. And then once that was done, ready for the honky. Now, I don’t know about you, but I like my concrete nice and sloppy. Steady. Come on. None of that. Wall up your concrete in there. And give it a good old screeding. And just give it a good old check every now and again with the old Gary Neville. Can’t be too sure, can you? Because if you get the levels and the heights wrong for when you’re doing the tiling, oh, you could go right the other way. That would be a bad day at the office. You lose your old marbles over that. And that’s the last little bit going in. We got black and white checkerboard tiles going in. Stay tuned for this one, brother.
5 Comments
Its easy to shit on any builders work, but your lads work is pretty much bang on!
Expansion joints Daddyo. Hope this is your house. Two columns and a gate sitting on 150mm of footing. No steel. Jeepers creepers.
Mesh just laid in the bottom isn't going to do a thing
Raise the rebar! Cowboys.
Nice one 👍