i’ve always wanted a pool and since I’m a DIYer I decided to see how hard it could be and gave up after 5 seconds and called in the big guns i’m literally shookth at how quickly these things come together crew at Samson Pool has completed the dig in about 6 hours it’s almost like they’ve done this before it was so wild to see this huge hole in our yard no turning back now day two had the crew assembling all the outer structure i’m a perfectionist but these guys might have me beat always checking and double-checking to make sure everything is absolutely perfect this is after 2 days of work and again I am blown away by the transformation day three was another big day with a cement truck arriving bright and early to get everything locked into place these long stairs are going to be so perfect for traffic flow and for friends with little ones to play on samson’s crew worked so hard in the heat and honestly I think this would have been a fun job for me tunes hard work and the sun on my back after the crew left for the day we snuck in to stand at the deep end for the last time because tomorrow they’re coming back to install our liner and fill it with water can you believe it in only 4 days stay tuned to see his baby all filled

20 Comments

  1. Why is there so much hate
    Like bro, its a pool in her back garden, she aint destroying the world or something

Write A Comment

Pin