I don’t want to start a fight with a supplier, but this seems way off. Am I crazy? Try and guess which one is supposed to be 8.

by Diego7759

45 Comments

  1. JahoclaveS

    Rocks 4 other 8? I guess the real question is, are these stacks 4 or 8?

  2. Kinda off topic but what did you use to make that plot? Super cool.

  3. I lost it when I saw the LiDAR map. That is hilarious that you were so skeptical that you proved it with LiDAR.

    10/10. You are awesome op.

  4. Botanicalduke

    Is one yards and one tons? Gravel is normally sold by the ton and soil is normally by the yard 8 tons of gravel is about 4 yards

  5. thorn2040

    Ain’t no way. I ordered 9 yards of gravel, and they brought a full dump truck

  6. DjScenester

    The 4 may be a little light, the 8 looks good… you are about right. Sometimes they are a little over and a little under but looks legit

  7. VeterinarianJaded462

    This post really highlights to me how we need more topographical maps on this sub.

  8. Spiritual-Can-5040

    Can’t help you. You’re missing the requisite banana for size reference.

  9. der_innkeeper

    OP just casually dropping a LIDAR map, and walking away without saying anything else.

  10. one normal dump truck is around 10 CY. yes you got scammed

  11. beepbopboopguy

    They have a very creative version of measuring. Neither of this is much over 8 yards. Maybe 8 total

  12. Order stone in tons by figuring yardage and then using a multiplier based on size of stone:

    Small stone x 2
    Medium stone x 1.5
    Large stone yard = large stone ton

  13. seanmonaghan1968

    I had this issue a few years ago. They quoted m3 but when I questioned it they then said they never go off volume only off weight as the yards had weigh scales for the trucks and that was how they should have quoted.

  14. BustedB0nes

    One carries more weight wet than the other.

  15. Ok-Assignment3066

    Never seen someone sell gravel by the yard.. maybe that’s just all the landscaping companies and material dealers in my area but typically it’s weight

  16. BasketFair3378

    The body under the pile just makes it look bigger.

  17. structuremonkey

    Yards or tons? Maybe you have your units confused

  18. CyberpunkEpicurean

    When I buy 2 yards of topsoil, the pile it makes is bigger than each of those. Maybe I could believe 1 pile is 4 at most. Def not bigger than 4 (and it honestly looks like 3 to me).

  19. zeustke165

    Very common for loam to be sold by the yard and gravel and stone by the ton.
    Stone and gravel typically ranges from 2400-3000 pounds per yard.
    8 ton=16000 pounds
    16000/3000= 5.33 yards
    5.33+4= 9.33 yards total for both piles

  20. SharpTool7

    If Nicholas cage shows up, there is an underground vault.

  21. Nodnardsemaj

    Looks like 5 yards total, to me. I’m just going off of crushed rock knowledge and a visual estimate, though

  22. Johnnthomas23

    Work at a landscaping Co and dump these all day. Both look around 4 yards definitely not 8

  23. 3d1thF1nch

    Hahaha the pettiness of that mapping is superb. So that’s LIDAR? That’s cool

  24. HumanContinuity

    Brother, ain’t no one gonna argue with a man who came armed with lidar maps.

  25. Electronic-Cable-772

    Are you sure it’s not 8 tons of rock and 4 yards of dirt?

  26. Expert_Might_3987

    That landscape contractor is gonna shit when he sees that last image lol.

  27. Haha. I win a small claims case against a company dropping off dirt in the same way this guys was. I used a volume equation measuring the height and radius and a representative measure weighed which demonstrated it wasn’t what I paid for either by weight or by volume. I think I go 2T of topsoil, and it was less than 1/2

  28. loudgeoligist

    One is sold in tons and the other one is sold in yards. I literally just had the same thing happen to me….

  29. Boy it hurts my head that you all say “yard” instead of “cubic yard”.

  30. Ewksanegomaniac

    I want to see your landscapers reaction when you call him out with a mf LIDAR scan.

  31. Looks like they brought you eight yards, 4 yards of each. Maybe miscommunication.

  32. freeball78

    A Ranger, Tacoma, or Colorado bed is about a half yard.

    Source, buy sand by the half yard in my Tacoma

  33. Plus-Suit-5977

    Sometimes material has minimum purchase or delivery amounts. Sometimes it’s not all delivered at the same time. Maybe they dug a 4 yard hole underneath you know? 😀

    Seriously. Neither of those piles is close to 4 yards. A dumpster filled to the top is 4 yards.

    You probably got overcharged, and I wouldn’t let them use that and charge you that, if that’s the whole pile.

    Source:designer for exterior spaces for national company and have seen other companies do stuff like this.

    We are already the most expensive, and give a 25 year warranty, so we don’t do stuff like that. We don’t want any leftovers or to have to schedule another delivery.

  34. Sweet_Common_850

    “he’s got the f@&king LiDAR an all out” what a ledge

Write A Comment

Pin